production
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revision | |||
production [15/03/2023 08:59] – mike_gss | production [15/03/2023 08:59] (current) – mike_gss | ||
---|---|---|---|
Line 9: | Line 9: | ||
**Biosteering** | **Biosteering** | ||
+ | |||
Biosteering is discussed in further detail later, suffice to say here that biostratigraphy allows relatively complex borehole trajectories to be drilled and unconventional reservoirs (in terms of structure and geometry) exploited. | Biosteering is discussed in further detail later, suffice to say here that biostratigraphy allows relatively complex borehole trajectories to be drilled and unconventional reservoirs (in terms of structure and geometry) exploited. | ||
Line 18: | Line 19: | ||
**Geostopping** | **Geostopping** | ||
+ | |||
Geostopping is the identification of specific biozonal horizons at which drilling needs to stop in order to effect an operational/ | Geostopping is the identification of specific biozonal horizons at which drilling needs to stop in order to effect an operational/ | ||
production.1678870747.txt.gz · Last modified: 15/03/2023 08:59 by mike_gss